Global Cynax Bangladesh Ltd.Global Cynax Bangladesh Ltd.Global Cynax Bangladesh Ltd.Global Cynax Bangladesh Ltd.
  • Home
  • About Us
    • Leadership
    • Our History
    • Authorization & Certificates
  • Product & Solutions
    • Compressed Air Solution

      • Completes
        • Reciprocating Compressor
        • Oil-Injected Screw Compressors
        • Oil Free Screw Compressor
        • Centrifugal Air Compressor
      • Treatment Solution
        • Air Dryers
        • Line Filters
        • Air Receiver
      • Services & Support
        • Air Compressor Rental
        • Technical Support
    • Heating & Cooling Solution

      • Boiler & Heater
        • Steam Boilers
        • Thermic Fluid Heater
        • Waste Heat Recovery Boilers (EGB)
        • Boiler Service & Maintenance
      • Electric Chiller
        • Centrifugal
        • Screw (Air-Cooled)
        • Screw (Water-Cooled)
        • Scroll
        • HVAC Air Filter
      • Plate Heat Exchanger
    • Power Generate & Transmit

      • Bearing & Accessories
        • Bearing, Housing & Grease
    • Petroleum Equipment

      • Refueling Solution
        • Fuel Dispenser
        • LPG Dispenser
        • CNG Compressor
      • Industrial Fuel Management
      • Centrifugal Separator/Oil Purifier
      • Lincoln Lubrication System
  • Service & Support
    • Project Consultancy
      • Turnkey HVAC Contracting
      • Boiler Turnkey Project Execution
      • Refueling Station/Petrol Pump Project Consultancy
    • Upgradation & Major Overhauling
      • Airend
      • Boiler Upgradation
    • Online Shop
  • Contact Us

Boiler Turnkey Project Execution

    Home Boiler Turnkey Project Execution

    Boilers – Supply, Fabrication, Erection & Commissioning

    Global Cynax undertakes complete works of boilers  on turnkey basis with design, supply, fabrication, erection & commissioning.

    • Complete boiler room internal works like ducting, piping, structural tanks, refractory, insulation, electrical & instrumentation work.

    • Chimney with PCB clearance.

    • Diesel/Furnace storage tanks and its loading and distribution systems.

    • Coal handling plant for the boiler capacity and available storage & installation space.

    • Steam piping from boiler room to the utility with steam accessories, stress analysis and reliving.

    • Ash handling plant both mechanical as well as pneumatic system with also silo.

    Due to complete support of design, drawing, planning, executing, monitoring, commissioning and handing over are all handled by the same company Global Cynax, it saves you time & money. The following advantages of choosing Global Cynax as your project executor partner-

    Design & Drawing Phase of Project:

    • We provide chimney design calculations as per norms.

    • Sizing designing ducting layout to suit your boiler house.

    • Sizing designing ducting layout to suit your feed water and furnace oil locations.

    • Refractory and insulation design as per boiler requirement.

    Planning, Executing & Supervision:

    • Global Cynax engineers will be available at site, round the clock.

    • Our project team at site ensures complete adherence to safety and statutory standards as outlined in the Thermax Project Manual.

    • Project schedules are prepared and managed using MS Project (Bar Chart)

    • The designated project manager of Global Cynax will be a single point of contact/communication till hand-over.

    • Project manager will be responsible for the monitoring and schedule adherence of the MS project with bar chart.

    • Periodic reporting to the customers in our standard formats on project development.

    Commissioning & Handing over:

    • Global Cynax & Thermax highly skilled engineers do the commissioning.

    • Supply of utility required for commissioning.

    • Training plant personnel on operation of the boiler provided.

    For more information please call +8801999447777

    Service & Support

    • Project Consultancy
      • Turnkey HVAC Contracting
      • Boiler Turnkey Project Execution
      • Refueling Station/Petrol Pump Project Consultancy
    • Upgradation & Major Overhauling
      • Airend
      • Boiler Upgradation
    • Online Shop

    Company Information

    News & Events
    Careers
    Code of Conduct

    OFFICE LOCATION- DHAKA

    REGISTERED  OFFICE:

    Suite # 15DE, 5A & 5B, Meherba Plaza, 33 Topkhana Road, Dhaka.

    CORPORATE  OFFICE:
    Suite # A-5, 5th floor, Ring Tower, 32-35 Ring Road, Adabor, Dhaka.

    Office Location-Chattogram

    Kader Tower (5th Floor),
    128 Jubilee Road, Chittagong.

    Facility Unit

    Kalampur, Opposite to Build-Trade, Dhamrai
    Dhaka 1350, Bangladesh.

    Copyright 2022 Global Cynax Bangladesh Ltd. | All Rights Reserved
    • Home
    • About Us
      • Leadership
      • Our History
      • Authorization & Certificates
    • Product & Solutions
      • Column 01
      • Column 02
      • Column 04
      • Column 03
    • Service & Support
      • Project Consultancy
        • Turnkey HVAC Contracting
        • Boiler Turnkey Project Execution
        • Refueling Station/Petrol Pump Project Consultancy
      • Upgradation & Major Overhauling
        • Airend
        • Boiler Upgradation
      • Online Shop
    • Contact Us
    Global Cynax Bangladesh Ltd.